SR 300 Multiuse Path (from St. George Island Bridge to US 98) [433568-1]

SR 300 Multiuse Path (Island Drive from St. George Island Bridge to US 98) / FDOT FPID 433568-1 / #NW76 / Apalachicola River and Bay Watershed / Franklin County

This FDOT project impacts an estimated 0.26 acres of jurisdictional wetlands.  No private mitigation bank option, or any NWFWMD In-Lieu Fee site, was available as mitigation.  Per USACE Permit SAJ-2015-02153 (NW-RLT), offsetting mitigation was implemented in October 2016 at St. Joseph Bay State Buffer Preserve – Southgate.  No state mitigation was required.

SAJ-2015-02153 NW-RLT (1/13/2016)

ERP Exemption (7/21/2015)