US 90 Yellow River Bridge [424508-1]

US 90 Yellow River Bridge / FDOT FPID 424508-1 / #NW55 / Pensacola Bay System Watershed / Okaloosa County

Per the USACE permit, replacement of the US 90 Yellow River Bridge impacted an estimated 2.93 acres of jurisdictional wetlands (1.31 acres of permanent impact; 1.62 acres of temporary impact).  According to the FDEP permit, direct impacts were to 4.08 acres (1.31 acres of wetland fill; 1.57 acres of wetland shading; 1.20 acres of clearing and temporary fill).  Mitigation consisted of debiting 2.40 credits from the NWFWMD Yellow River Ranch (ILF) Mitigation Area in accordance with state and federal permits (2.40 credits required by FDEP permit; 2.24 credits required by USACE permit).  No private mitigation bank was available.

SAJ-2012-00501 SP-MMW (12/9/2013)

FDEP 46-0310023-002-EM (9/3/2013)

FDEP 46-0310023-001-EI (6/20/2012)

Credit Debit Verification (3/7/2014)

Mitigation Attachment