Cat Point Breakwater and Marsh

Cat Point Breakwater and Marsh / Apalachicola River and Bay Watershed / Franklin County / Legacy ID – UWRMP 5.5.6

Approximately one acre of salt marsh was created via construction of a breakwater and planting of marsh vegetation.  This mitigation offset impacts associated with replacement of the SR 300 St. George Island Bridge.  Breakwater construction was authorized by USACE Permit SAJ-2003-05450 NW-JWS (6/6/2003).